RE-1 Valley School District
Our first engagement as a full-service contractor — engineering, programming, and installation. District-wide integration plus a full system replacement at Sterling High School, complete with district-wide analytics.
Our first engagement as a full-service contractor — engineering, programming, and installation. District-wide integration plus a full system replacement at Sterling High School, complete with district-wide analytics.
As CCSD’s preferred service partner, we delivered top-of-the-line VAV air handlers, exhaust fans, and water systems with ABB BACnet controllers and KODE Labs analytics — existing Trane controls integrated into a Niagara framework and tied together with our custom graphics package.
Part of our ongoing partnership with Cherry Creek School District, extending modern controls and district-wide analytics across additional campuses. (Project in progress.)
Cutting-edge upgrades that minimize energy waste while maximizing air quality — new VAV controllers, an Air Handling Unit, and an Energy Recovery Ventilator, with NiagaraMods Reflow and KODE Labs platforms.
Building automation controls for the campus.
Invited to perform programming and technical support on an advanced system — the second of its kind in the U.S. Phoenix Contact JACEs monitor two redundant systems simultaneously for fully redundant chiller control with zero single points of failure.
Controls installation for Micron’s new Longmont facility — a combination of comfort-cooling and high-end data-center work integrating chilled-water In-Row Coolers (IRCs) at large scale.
Installing contractor for a complex lab design — a venturi-valve system with BACnet-to-Modbus integration enabling tight control of lab pressures and air circulation for a high-level lab environment.
Maintaining the pristine conditions of NREL’s clean room for solar energy research — managing humidity, particulates, and critical processes, with Honeywell Midas hydrogen gas monitors for real-time detection and alarms.
Controls centralization across the Waterton campus (Phase 2, Hill Area), partnering with Albireo Energy — unifying disparate building controls under a centralized supervisor for streamlined monitoring across a secure aerospace campus.
Building-automation controls for ABB’s Senatobia, Mississippi facility. (Project details to follow.)
One of our first large projects — programming and commissioning support alongside installation for the new Bureau of Land Management building, meeting the high operational standards of the GSA.
A significant controls upgrade as subcontractor for The Jamar Company — converting seven built-up air handlers from pneumatic to full DDC, transitioning Lon Talk to BACnet IP with ABB Building Automation, with optimal start/stop and heating-loop resets.
Installation contractor for the Moxy Hotel’s Variable Refrigerant Flow (VRF) systems — over 200 terminal units supplied by two dozen condensing units, delivered through changing scope and timelines.
Snowmelt control expansion for the resort village, partnering with Design Mech — precise control of slab snowmelt zones for safety and efficiency at altitude.
State-of-the-art energy management for the Tallahassee and Columbus facilities — Honeywell Optimizer Advanced controllers with KODE Labs analytics delivering tracked, validated, real-time energy savings.
Building automation controls for the State Patrol office.
We build detailed 3D models and custom operator graphics of the facilities we control — so operators navigate their building, not a list of cryptic point names. It's a capability most controls shops don't offer in-house.






We build custom Reflow front-ends on top of Niagara — branded dashboards, navigable 3D floor plans, and intuitive equipment graphics that turn raw points into something operators can read at a glance.








Your knowledge and experience were clearly evident throughout the process, and it gave us a lot of confidence in the work being done.
— UCS clientTell us about your facility and requirements.