Condition, constraint, decision — and what the owner got

How we actually work: understand the building's condition, respect its constraints, and make the call that serves the owner — then stand behind the result.

Foothills Gateway

Fort Collins, Colorado
Condition

Seven built-up air handlers running on aging pneumatic controls over a LonTalk network — increasingly hard to service and impossible to optimize.

Constraint

An occupied facility serving clients every day, delivered as subcontractor to The Jamar Company — no room for extended downtime.

UCS decision

Convert pneumatics to full DDC and migrate LonTalk to BACnet/IP on ABB Building Automation, adding optimal start/stop and heating-loop resets.

Owner result

A fully modern, serviceable DDC system with energy-saving sequences — while retaining the mechanical infrastructure the building already owned.

DDC conversionBACnet/IPABB

Edgecore Data Facility

Mesa, Arizona
Condition

An advanced data-center cooling plant — only the second system of its kind in the U.S. — requiring chiller control with no tolerance for failure.

Constraint

True redundancy: every element of the control system duplicated, with zero single points of failure.

UCS decision

Program Phoenix Contact JACEs to monitor two fully redundant systems simultaneously, validated across failure scenarios.

Owner result

Fully redundant chiller control with zero single points of failure — mission-critical uptime by design, not by luck.

Phoenix Contact JACERedundantData center

Nederland Community Library

Nederland, Colorado
Condition

A community building needing better air quality and lower energy waste from an aging mechanical setup.

Constraint

A small-facility budget that had to deliver visible results the staff could actually use.

UCS decision

New VAV controllers, an air-handling unit, and an energy-recovery ventilator — fronted by NiagaraMods Reflow dashboards with KODE Labs analytics.

Owner result

Minimized energy waste and improved air quality, with navigable floor-plan graphics the library staff can read at a glance.

VAVERVReflowKODE Labs

School District & Education Building Automation

Sterling, Colorado

RE-1 Valley School District

Our first engagement as a full-service contractor — engineering, programming, and installation. District-wide integration plus a full system replacement at Sterling High School, complete with district-wide analytics.

Full-serviceDistrict-wideAnalytics
Aurora, Colorado

Cherry Creek Schools Innovation Campus

Universal Controls Solution outfitted this new school building with VAV air handlers, exhaust fans, and water systems, using ABB BACnet controllers for system communication and KodeLabs for analytics. We also integrated the existing Trane controls into a Niagara framework. CCIC received our custom graphics package, tying every system together in a clean, user-friendly interface.

ABBNiagaraKODE Labs
Aurora, Colorado

Cherry Creek Schools — Eaglecrest High School

Part of our ongoing partnership with Cherry Creek School District, extending modern controls and district-wide analytics across additional campuses. (Project in progress.)

ControlsAnalyticsIn progress
Nederland, Colorado

Nederland Community Library

Cutting-edge upgrades that minimize energy waste while maximizing air quality — new VAV controllers, an Air Handling Unit, and an Energy Recovery Ventilator, with NiagaraMods Reflow and KODE Labs platforms.

VAVERVKODE Labs
Denver, Colorado

Denver Jewish Day School

Building automation controls for the campus.

Controls
Project photo
Colorado

Mountain View School

New building-automation controls for Mountain View Academy, delivered with mechanical partner Murphy Mechanical — completed in 2025.

Murphy MechanicalControlsSchools

Data Center Cooling Controls, Labs & Biotech

Mesa, Arizona

Edgecore Data Facility

Invited to perform programming and technical support on an advanced system — the second of its kind in the U.S. Phoenix Contact JACEs monitor two redundant systems simultaneously for fully redundant chiller control with zero single points of failure.

Phoenix Contact JACERedundantData center
Longmont, Colorado

Micron Technologies

Controls installation for Micron’s new Longmont facility — a combination of comfort-cooling and high-end data-center work integrating chilled-water In-Row Coolers (IRCs) at large scale.

IRCChilled waterIntegration
Louisville, Colorado

Biodesix, Inc

Installing contractor for a complex lab design — a venturi-valve system with BACnet-to-Modbus integration enabling tight control of lab pressures and air circulation for a high-level lab environment.

Venturi valvesBACnetModbus
Golden, Colorado

National Renewable Energy Laboratory

Maintaining the pristine conditions of NREL’s clean room for solar energy research — managing humidity, particulates, and critical processes, with Honeywell Midas hydrogen gas monitors for real-time detection and alarms.

Clean roomHoneywell MidasSafety

Commercial, Industrial & Government

Waterton, Colorado

Lockheed Martin — Waterton

Controls centralization across the Waterton campus (Phase 2, Hill Area), partnering with Albireo Energy — unifying disparate building controls under a centralized supervisor for streamlined monitoring across a secure aerospace campus.

CentralizationCampusAerospace
Senatobia, Mississippi

ABB Plant

UCS was selected by ABB to deliver this project as an ABB Cylon System Integrator. The expansion was completed with a fully integrated smart building platform built for long-term performance and operational excellence. The system gives ABB intelligent control of the new space while prioritizing comfort, energy efficiency, cybersecurity, and scalability.

ABBManufacturing
Denver, Colorado

Denver Federal Center — BLM Facility

One of our first large projects — programming and commissioning support alongside installation for the new Bureau of Land Management building, meeting the high operational standards of the GSA.

GSAProgrammingCommissioning
Project photo
Fort Collins, Colorado

Foothills Gateway

A significant controls upgrade as subcontractor for The Jamar Company — converting seven built-up air handlers from pneumatic to full DDC, transitioning Lon Talk to BACnet IP with ABB Building Automation, with optimal start/stop and heating-loop resets.

DDC conversionBACnet IPABB
Boulder, Colorado — across from CU Boulder

Moxy Hotel

Installation contractor for the Moxy Hotel’s Variable Refrigerant Flow (VRF) systems — over 200 terminal units supplied by two dozen condensing units, delivered through changing scope and timelines.

VRF200+ unitsHospitality
Copper Mountain, Colorado

Copper Mountain Village — Snowmelt Expansion

Snowmelt control expansion for the resort village, partnering with Design Mech — precise control of slab snowmelt zones for safety and efficiency at altitude.

SnowmeltResortHydronic
Florida & Georgia

Ashley Furniture — Energy Project

State-of-the-art energy management for the Tallahassee and Columbus facilities — Honeywell Optimizer Advanced controllers with KODE Labs analytics delivering tracked, validated, real-time energy savings.

Energy mgmtHoneywellKODE Labs
Fort Collins, Colorado

Colorado State Patrol

Building automation controls for the State Patrol office.

ControlsGovernment
Project photo
Fort Collins, Colorado

Advanced Energy — Fort Collins Campus

A multi-phase controls refresh of Advanced Energy’s Building 2 — RTUs, VAVs, and heating-water systems brought under JACE supervisory control across three phases (2021–2024), sequenced around a fully operational facility.

Multi-phaseJACERetrofit
Signature capability

Live cutovers — the work that cannot stop

Controls work is straightforward when the building can be shut down. The hard version is converting a system that has to keep running. These are the jobs behind the zero-downtime number above.

Live central chiller plant conversion

State of Colorado facility · with US Engineering
Condition

A central chiller plant on Siemens controls, with a state controls standard that called for a different platform.

Constraint

The plant could not go down. An operating building, mid-season, with loads that had to be served throughout the conversion.

UCS decision

Stage the cutover with a written sequence and a defined fallback at every step: inventory first, verify the new path point-to-point, then transfer. Convert to Distech because the owner’s standard required it — not a line we lead with.

Owner result

The plant never dropped. The building met its state controls standard, and the owner got a documented system their next contractor can work on.

Live cutoverSiemens → DistechChiller plant

Cherry Creek Innovation Campus

Cherry Creek Schools, Colorado
Condition

Two wings needing to share controls data across a run of more than 2,000 feet — roughly twenty times what standard Ethernet will carry.

Constraint

Trenching fiber or building a chain of intermediate closets was disproportionate to the need, and the equipment on both ends was not T1L-native.

UCS decision

Use T1L purely as the long-run transport: media adapters at each end, single-pair Ethernet across the span, standard equipment on both sides.

Owner result

Full data sharing between wings over one pair, without fiber trenching or added closets — a fraction of the conventional cost.

T1L2,000+ ft spanSingle-pair Ethernet

Comm-bus reuse on competitive bids

Multiple Front Range projects
Condition

Existing communication trunks that other bidders scoped for a complete re-pull, priced into their proposals.

Constraint

Occupied buildings where opening ceilings and conduit is the most disruptive and expensive part of the job.

UCS decision

Test the existing pair first. Where it is sound, run T1L over the copper already in the wall instead of pulling new cable.

Owner result

The re-pull line item comes off the estimate entirely. Same scope, same outcome, materially lower number — and we have won work on exactly this difference.

T1L retrofitExisting wiringCompetitive win
Why multi-line matters on this work. The chiller-plant job converted a building away from a line we represent and onto Distech, because the owner’s standard called for it. A contractor who sells one product cannot make that recommendation — their answer is always their own line. More on how we choose a platform.
In-house capability

3D modeling & custom graphics

We build detailed 3D models and custom operator graphics of the facilities we control — so operators navigate their building, not a list of cryptic point names. It's a capability most controls shops don't offer in-house.

Ridgeview Classical Schools — floor model
Nederland Community Library — floor model
MC Admin — first-floor model
ABB Senatobia — detailed model
Ambrosia — street-level model
OFL — main floor model
Laika — floor model
Powered by Niagara Mods — Reflow

Live operator dashboards your team will actually use

We build custom Reflow front-ends on top of Niagara — branded dashboards, navigable 3D floor plans, and intuitive equipment graphics that turn raw points into something operators can read at a glance.

Ridgeview Classical Schools — navigable 3D floor plan
Colorado State Patrol — furnace equipment graphic
Nederland Library — ERV process graphic
Colorado State Patrol — branded dashboard
Colorado State Patrol — main floor model
Nederland Library — library floor model
ABB Senatobia — branded dashboard
ABB Senatobia — facility floor plans

Your knowledge and experience were clearly evident throughout the process, and it gave us a lot of confidence in the work being done.

— UCS client

Let's build your next project together.

Tell us about your facility and requirements.