Skip to content
contact@uniconllc.net(720) 282-5099Toll-free: (844) 654-1855⚠ Incident Report
Universal Controls SolutionUniversal ControlsSolution

Environ is available through Universal Controls Solution. Contact us to discuss product fit, availability, and purchasing options for your building.

Product availability: Environ is in private beta, with its production launch on January 1, 2027. Features, supported protocols, compatibility, and delivery options are confirmed at quotation.

What makes Environ different

Find it. Price it. Fix it. Prove it.

01

Every fault has a price

Each finding carries a cost built from your own site, so the work list sorts itself.

02

Fixed is a test result

After the repair, Environ runs the test again on the live equipment. Pass or fail, it stays on record.

03

Live in about a week

Data in a day or two. A typical building, up to a high-rise, is live in about a week.

04

Works with what you have

Connects to the controls already in the building. No new controllers to buy.

01 / The dollar figure

Every fault has a price.

Each finding carries a cost built from your site: your energy rate, your equipment, what was measured and how long it ran. The work list sorts itself. Fix what costs the most first.

Open findings, ranked by costSample data
FindingAddingPer year
Simultaneous heating and cooling · Air handler 2$41 a day$14,965
Outside-air damper stuck open · Air handler 1$26 a day$9,490
Supply fan running overnight · Air handler 3$17 a day$6,205
Duct pressure setpoint not resetting · Air handler 2$13 a day$4,745
Reheat valve leaking by · Zone 2-14$6 a day$2,190
Cost of leaving all five alone$103 a day$37,595
The cost of waitingSample data

The repair you don’t make keeps billing you.

One fault left open, simultaneous heating and cooling on one air handler:

$41every day it waits
$1,230after one month
$7,380after six months
$14,965after a year
A number you can checkCost of failure

Known inputs × measured deviation × duration

Inputs, units and assumptions stay visible, so each figure can be reviewed, argued with and trusted.

Energy rates

Your tariff or site rate, not a regional average.

Local currency

Shown in the currency the building is billed in.

Equipment and site values

Capacity, operating schedule and the asset inputs that apply.

Measured behavior

The observed deviation, how long it ran and how the system responded.

Illustrative examples with sample numbers, not measured results. Cost impact on faults is available with the January 1, 2027 launch.

02 / From finding to proof

Fixed is a test result, not a closed ticket.

Detection on its own moves nothing. Environ carries the finding out to the technician and brings the evidence back. After the repair, it runs the test again on the live equipment.

  1. 01DetectContinuous fault detection finds a persistent operating issue.
  2. 02PrioritizeCost, comfort and equipment consequence make the urgency obvious.
  3. 03ActThe finding becomes a work order for the contractor who already services the building.
  4. 04RetestDigital commissioning runs the standard sequence again on the repaired system.
  5. 05ProvePass or fail, the measured response is kept against the asset.
A closed work order is an administrative state. A passed retest is operational proof.
Tested the same way every time

27 prebuilt tests, 18 equipment types

Tests are aligned to ASHRAE Guideline 36-2024 where the guideline covers the equipment, so a result means the same thing on every building and after every repair.

On a project, and every day after

Environ Cx and Environ Watch

Automated commissioning for new and retrofit work, then continuous commissioning: prioritized work and a retest after each repair.

Into the field

Work orders

Work order systems connect through standard web APIs. BuildOps is connected through the API connector; other systems are scoped with your quote.

Guideline 36 references are not ASHRAE certification.

03 / Deployment

Data in days. Live in about a week.

Environ connects to the controls already in the building. Points are tagged automatically and people review only the exceptions, so the first findings arrive while the project is still fresh.

Day 1–2

Gateway live

Environ Edge is installed and data is flowing at five-minute intervals.

Week 1

Tagged and checked

Points are tagged automatically, people review the exceptions, and site-specific issues are worked out.

From there

Watch and prove

Fault detection runs continuously. Commissioning tests are scheduled, and each repair is retested.

Site size

Built to scale

A typical building, up to a high-rise: about a week. A campus or portfolio: a few weeks, scoped by point count.

Connects to

What you already run

Tridium Niagara and BACnet from day one. Other protocols follow as each driver is validated.

Easy on IT

Nothing reaches in

Outbound, encrypted connection. No inbound firewall rules. Ask about edge and on-premises options.

Deployment times are typical, not guaranteed. They assume network access, a point list and a supported connection are in place.

See it on one of your buildings.

Tell us about your controls platform and analytics priorities. UCS can help you evaluate Environ as a purchasing option and confirm current product availability for your site.